Datasheets for equipment sold into hazardous areas often list two certificates, one ATEX and one IECEx, and Gulf specifications ask for one, the other or both. Both put the same Ex code on the nameplate, yet they are different things. This guide explains each, how to read a marking, and what it means for a project in Qatar or the GCC.
ATEX vs IECEx in brief.
ATEX is the European Union's legal framework. Directive 2014/34/EU harmonises member states' laws on equipment and protective systems intended for use in potentially explosive atmospheres. It has applied since 20 April 2016, when it replaced Directive 94/9/EC.
IECEx is a certification system set up by the IEC, the International Electrotechnical Commission. It certifies equipment, service facilities and people against IEC standards, and publishes every certificate (IECEx).
Both assess equipment against the IEC 60079 series of standards, so the Ex code on a device reads the same under either scheme (Manufacturing Chemist). What differs is the legal force, who certifies, the label and where each is accepted.
What ATEX covers.
There are two ATEX directives. The equipment directive, 2014/34/EU, covers electrical and non-electrical equipment and protective systems. A second directive, 1999/92/EC, covers the safety and health of workers where explosive atmospheres may occur (EU-OSHA). In Great Britain the workplace side is implemented through DSEAR, which requires workplaces to be zoned (HSE).
Under the equipment directive, the route to the CE marking depends on the equipment category (Directive 2014/34/EU, Article 13):
- Category 1, typically for Zone 0 or Zone 20: EU-type examination by a notified body, plus quality assurance of production or verification of each product.
- Category 2, typically for Zone 1 or Zone 21: for electrical equipment and engines, EU-type examination plus supervised production checks or product quality assurance; for other equipment, internal production control with the technical file sent to a notified body.
- Category 3, typically for Zone 2 or Zone 22: internal production control, carried out by the manufacturer.
Equipment that meets the harmonised standards, including the EN 60079 parts, is presumed to conform (HSE). The list sits in Commission Implementing Decision (EU) 2022/1668, last amended on 3 September 2026 (European Commission). Usual zones per category are from Heating and Process.
What IECEx covers.
IECEx runs four schemes: certified equipment, certified service facilities, a conformity mark licence, and certified persons for the competence of people working in hazardous areas. More than 60 certification bodies in more than 35 countries take part (IECEx).
An IECEx Certificate of Conformity rests on three documents: a test report (ExTR) against the relevant standards, a quality assessment report (QAR) on the factory, and the certificate itself. The factory stays under surveillance audits while the certificate is current. IECEx requires independent testing and certification for every zone, while ATEX lets lower-risk Zone 2 equipment rely on the manufacturer's own declaration (IECEx FAQ).
Every certificate is public. The IECEx online system is the master record: if a certificate is not on it, it does not exist, and it is valid only while its status reads Current (IECEx FAQ).
Legal status.
ATEX is law in the EU. SGS describes it as a legal prerequisite for selling within the European Economic Area (SGS). IECEx itself says that to sell Ex products in the EU, ATEX is all that is required, and that ATEX is also used voluntarily outside the EU (IECEx FAQ).
Whether an IECEx certificate is enough depends on the country. Member countries recognise IECEx assessment data, though most still apply some national processing, and some non-member countries accept IECEx certificates too (IECEx FAQ).
How the markings differ.
The Ex code itself, such as Ex db IIC T4 Gb, means the same under both schemes. Around it, each scheme adds its own elements.
An ATEX plate carries the CE marking; the identification number of the notified body, where one is involved in the production control phase; and the specific marking of explosion protection, the Ex symbol, followed by the equipment group and category, with G for gas or D for dust (Directive 2014/34/EU, Article 16; Tameson). Any certified Ex plate also names the certification body and the certificate number (Cortem).
An IECEx plate carries the IECEx certificate number in the form IECEx XXX 18.0001, where XXX identifies the certification body, 18 is the year of issue and 0001 is the running number (IECEx FAQ).
Two suffixes matter on either kind of certificate. X means there are specific conditions of safe use, set out in the certificate and the instructions, which the installation must meet. U marks an Ex component, such as an empty flameproof enclosure, that has to be built into a certified device. The two never appear together (Cortem).
How to read a marking, field by field.
A device certified under both schemes might be marked CE 0000 Ex II 2G Ex db IIC T4 Gb with its ATEX certificate number, and IECEx XXX 18.0001X. The numbers are placeholders. Read it like this:
| Field | Example | What it tells you |
|---|---|---|
| CE and notified body (ATEX only) | CE 0000 | The product meets the EU directives that apply. The number identifies the notified body involved in production control. |
| Equipment group (ATEX) | II | For places other than mines. Group I is for mines. |
| Category (ATEX) | 2G | Category 2, high protection, typically for Zone 1. G is gas, vapour or mist; D is dust. |
| Protection concept | db | d is a flameproof enclosure and e is increased safety. Other codes include i, m, n, p and t. |
| Gas group | IIC | IIA propane, IIB ethylene, IIC hydrogen and acetylene, the most severe. IIC equipment may suit IIB and IIA; IIA equipment must not be assumed to suit IIB or IIC. |
| Temperature class | T4 | Maximum surface temperature 135 °C. T1 is 450 °C, T2 300 °C, T3 200 °C, T5 100 °C and T6 85 °C. |
| Equipment protection level | Gb | High protection, typically Zone 1. Ga is typically Zone 0 and Gc Zone 2; dust uses Da, Db and Dc. |
| IECEx certificate | IECEx XXX 18.0001X | Certification body, year and number. The X means conditions of safe use apply. |
Sources: groups, categories, gas groups, temperature classes and EPLs from Heating and Process; d and e from HSE; certificate numbers from the IECEx FAQ. Always read the full certificate.
Dust markings use groups IIIA to IIIC and write the surface temperature as a number, such as T135°C (Manufacturing Chemist).
Which one do projects in Qatar and the GCC ask for?
In Qatar, the certification a site accepts is set in the project or operator specification. We have not found a published national Ex certification scheme that applies to every project, and specifications differ between operators, so the specification decides. Read it before you buy.
Two neighbours have national routes built on IECEx. In Saudi Arabia, SASO added equipment for potentially explosive atmospheres, such as junction boxes and gas detectors, to the products that need a SASO IECEE/IECEx Recognition Certificate from 1 November 2021 (Intertek). In the United Arab Emirates, the ECAS-Ex scheme under the Ministry of Industry and Advanced Technology refers directly to the IECEx rules, and an application rests on an IECEx test certificate, test report and quality audit report (Intertek).
In practice, an IECEx certificate underpins more than one GCC route, and holding both IECEx and ATEX meets the most specifications. Neither replaces reading the spec.
UKCA and UKEX.
Great Britain implements the equipment directive through the EPS Regulations 2016, with separate 2017 regulations for Northern Ireland (GOV.UK). Since the end of 2020 the GB regulations call for the UK marking (legislation.gov.uk), and certification bodies call UKCA certification for Ex equipment UKEX (DEKRA).
In August 2023 the UK government announced an indefinite extension to the use of CE marking for 18 product regulations, including equipment for potentially explosive atmospheres (US International Trade Administration). The legislation took effect on 1 October 2024 (GOV.UK). For a GCC project, UKCA matters only where the specification names it.
ATEX and IECEx compared.
| ATEX | IECEx | |
|---|---|---|
| What it is | EU law: Directive 2014/34/EU for equipment, Directive 1999/92/EC for workplaces | An international certification system set up by the IEC |
| Where it is required | To place equipment on the EU market | Where a country or specification accepts or requires it, and as the basis for Saudi and UAE routes |
| Technical standards | Harmonised EN standards, including EN 60079 | IEC standards, including IEC 60079 |
| Who certifies | EU notified bodies, depending on the category | IECEx certification bodies and test laboratories |
| Zone 2 equipment | Category 3: the manufacturer's internal production control | Independent testing and certification |
| Factory oversight | Production quality assurance or supervised checks for categories 1 and 2 | A quality assessment report and surveillance audits for every certificate |
| On the plate | CE marking, notified body number, Ex symbol, group and category | IECEx certificate number |
| Checking a certificate | Ask the manufacturer for the certificate and the declaration of conformity | Search the public IECEx database; status must read Current |
| People and services | Not covered by the equipment directive | Certified service facilities and certified persons schemes |
Sources as cited above, plus SGS on the declaration of conformity.
What to ask a supplier.
- Both certificate numbers, ATEX and IECEx, and a copy of each certificate.
- The IECEx certificate checked in the online database, with its status Current.
- Any X conditions of safe use, and how the installation meets them.
- The zone, gas or dust group and temperature class against your area classification drawing.
- The certified ambient temperature range against where the device will sit: plant in the Qatar sun runs hotter than the 45 to 50 °C air.
- Whether your specification also asks for UKCA, an ECAS-Ex certificate or a SASO certificate.
How Quoriam handles it.
We work to your site's specification, select a device certified for each point's zone, gas group and temperature class, and hand you every certificate for approval before anything is fitted. See ATEX and hazardous area monitoring for what we monitor in classified areas.
Questions buyers ask.
Something else? Ask us during the free assessment.
Is an IECEx certificate accepted in the EU?
Not on its own. To place Ex equipment on the EU market, ATEX is what the law requires, and IECEx says so itself (IECEx FAQ). Both schemes test against the IEC 60079 family of standards, so a manufacturer can hold both certificates for the same product, and its plate then shows both markings.
Which certification does Qatar require?
The project or operator specification decides. We have not found a published national Ex certification scheme in Qatar that applies to every project, and specifications differ between operators. Where it allows either, equipment with both certificates stays usable on the next project.
Does Zone 2 equipment need a third-party certificate?
Under ATEX, category 3 equipment for Zone 2 or Zone 22 goes through internal production control, carried out by the manufacturer (Directive 2014/34/EU, Article 13). Under IECEx, every zone needs independent testing and certification. If your specification asks for IECEx, a manufacturer's ATEX declaration alone won't meet it.
What does an X at the end of a certificate number mean?
It means the certificate sets specific conditions of safe use, such as limits on temperature or the chemicals the device may meet. The installation must meet them. A U instead marks a component that must be built into a certified device (Cortem).
How do I check that an IECEx certificate is valid?
Search the IECEx online certificate system by the certification body's identifier and the certificate number, then check the status on page one reads Current. Printed and PDF copies are uncontrolled, and a certificate that isn't on the system doesn't exist (IECEx FAQ).
Is a UKCA or UKEX certificate valid in Qatar?
UKCA is the marking for equipment placed on the market in Great Britain under the 2016 regulations. Whether a Qatar project accepts it is up to the project specification. If the specification names only ATEX or IECEx, a UKEX certificate on its own won't meet it.
Related.
Where this matters on site.
- ATEX and hazardous area monitoring
Certified wireless sensors for Zone 1 and Zone 2 areas at LNG, oil, gas and chemical sites.
- Vibration monitoring
Bearing wear, imbalance and misalignment on pumps, motors, fans and compressors.
- Oil, gas and energy
Valve line-ups, rotating equipment, hazardous areas and solar assets.
Monitor the machines inside your hazardous areas.
A free three-week assessment. We review your area classification, specification and critical equipment, then recommend which certified sensors will pay back first.
We take on two assessments a month.Quoriam is designed to pay back within six months. How we calculate payback











